The U.S. Court of Appeals for the Third Circuit recently rejected EPA’s application of its “Reactivation Policy” to a St. Croix, USVI refinery, finding that a Clean Air Act (CAA) Prevention of Significant Deterioration (PSD) Permit was not required to restart operations although it had been idle since 2012. In a July 25, 2023 opinion, Port Hamilton Refining and Transportation LLP v. EPA, the Court vacated EPA’s permitting decision, concluding that the agency had exceeded its statutory authority and is barred by “unambiguous” language of the CAA from classifying the Refinery as “new” for purposes of PSD permitting.
Background
The Refinery was constructed in the late 1960s under an agreement with the USVI government and USVI port authority. The Refinery was operated by the same owner until it ceased operations in 2012 due to financial concerns. After failing to find a purchaser, the owner filed for bankruptcy. In 2016, Limetree Bay Terminals purchased the Refinery from the bankruptcy estate.
Limetree requested guidance from EPA regarding whether a PSD permit would be required to restart operations. In 2018, EPA, applying the Reactivation Policy, concluded that a PSD permit would not be required as the Refinery had been “idled” and not shut down. The Refinery was allowed to resume operations under a plantwide applicability permit issued by EPA in 2018.[1] After millions of dollars in spending, Limetree brought the Refinery back online in February 2021 and promptly faced a series of air and water malfunction and noncompliance events. These events included flaring incidents resulting in oil and water discharging on nearby homes and excess emissions of hydrogen sulfide over multiple days, resulting in a closure of nearby schools. Eventually, EPA issued a Section 303 emergency order for Limetree to immediately cease all operations. This was followed by Limetree filing for bankruptcy in July 2021.
Port Hamilton purchased the Refinery from the Limetree bankruptcy estate in December 2021 and requested direction from EPA regarding the permitting status of the Refinery. In a reversal of its 2018 conclusion, EPA concluded in a November 2022 Final Determination Letter that a PSD permit was required. Per EPA’s Reactivation Policy, EPA concluded that “the Refinery was permanently shut down in 2012 and that restarting the Refinery qualifies as construction of a new major stationary source under the federal PSD permitting regulations.”[2] Port Hamilton then petitioned the Third Circuit Court of Appeals for review.
The Reactivation Policy
PSD permits are required for new major sources and major modifications of existing sources in areas that meet the national ambient air quality standards (attainment areas). PSD permits often result in a facility being required to install state-of-the-art and expensive pollution controls. Specifically, the CAA provides that “[n]o major emitting facility in which construction is commenced after August 7, 1977, may be constructed” in an attainment area without a PSD permit.”[3] The statute defines “construction” to include major modifications to a major emitting facility.[4] The PSD regulations provide that “no new major stationary source or major modification … shall begin actual construction” without a PSD permit.[5]
The “Reactivation Policy” is EPA’s framework for determining when a facility has been permanently shut down or whether the facility has been temporarily idled for purposes of new source PSD permitting. The earliest version of the Reactivation Policy first appeared a 1979 EPA Memorandum and then has appeared in several PSD applicability determinations over the following twenty plus years.[6] As originally set forth by EPA, the Reactivation Policy was a simple concept- if a source could demonstrate, to the satisfaction of the Administrator, that its two year (or longer) shutdown was not intended to be permanent, PSD review would not apply to its reactivation.[7] While the PSD applicability determinations were fact specific, it was not until EPA’s 1999 Administrative decision, In the Matter of Monroe Electric, where a framework was developed to determine whether a source was shut down or idled. Monroe identifies six factors for EPA to use in evaluating the source’s intent:[8]
1. The amount of time the facility has been out of operation.
2. The reason for the shutdown.
3. Statements by the owner or operator regarding intent.
4. Cost and time required to reactivate the facility.
5. Status of permits.
6. Ongoing maintenance and inspections conducted during the shutdown.
The Final Determination for the Refinery goes a step beyond Monroe to document its comprehensive explanation and legal bases for the Reactivation Policy. An attachment to the Final Determination states that it is provided to serve as a “reaffirmation” of the Reactivation Policy.[9] The Final Determination also engages in a lengthy discussion of the application of the Reactivation Policy to the Refinery, concluding, in laborious detail, that the Refinery had been completely shut down since 2012 and thus would be subject to new source PSD permitting.[10]
The Court’s Decision
The Third Circuit Court of Appeals reviewed the Final Determination per 42 U.S.C. §7607(b)(1). This on-the-record review concluded that the Reactivation Policy does not apply to the Refinery based on the unambiguous language of the CAA. As a result, the Court determined that EPA exceeded its authority by requiring Port Hamilton to obtain a PSD Permit:
The Clean Air Act unambiguously limits the PSD’s program’s application to newly constructed or modified facilities. The Refinery is not new and has not undergone a “modification” as the Act defines that term. The EPA therefore exceeded its authority by requiring Port Hamilton to obtain a PSD permit for the Refinery.
The Court explained that the only facilities subject to PSD permitting are those major emitting facilities “constructed” (or modified) in an attainment area after August 7, 1977. As the Refinery was constructed prior to August 7, 1977, and EPA did not present any evidence of a “major modification,” EPA had no authority to apply PSD review.
Further, the Court rejected conducting a Chevron analysis.[11] The Court rejected EPA’s claims that the term “construction” is ambiguous and that it could include construction at a shutdown facility to prepare for a restart. The Court did not mince words in finding that the statute is not ambiguous and that it is clear that “the type of construction that requires a PSD permit is construction that commenced after 1977 that brings a major emitting facility into existence.”
Takeaways from the Third Court Decision
- The Court’s opinion may have effects beyond the Third Circuit, significantly narrowing EPA’s PSD permit review requirements where idled facilities are brought back into operation. Although the Court’s opinion could be read to only apply to shuttered facilities, constructed before 1977, we read it as much broader, fundamentally calling into question the continued applicability of the Reactivation Policy. As stated by the Court, the CAA definition of construction includes “modification” but does not include “restart after a shutdown” or language to that effect . . . the CAA limits the PSD program’s reach to only two circumstances: construction and modification.
- EPA had also focused on the Refinery’s “environmental justice” impacts. The Refinery, located in a predominantly low-income and minority community, certainly has had a history of compliance issues.[12]EPA’s §303 Emergency Order shutting down the Refinery was hailed by EPA as an environmental justice victory.[13] Although the Final Determination contains a discussion of the environmental justice impacts of the Refinery, environmental justice concerns did not find their way into the Court’s evaluation or opinion, continuing to support doubts raised about the resilience of Environmental Justice goals when faced with the limits of statutory and regulatory authority.
- The Court gave short shrift to EPA’s Chevron deference analysis, rejecting such analysis in a one sentence footnote, adding more fuel to the fire that Chevron deference is on its way out. If the Refinery’s history, including a 10-year cessation of operations, could not compel the Court to defer to EPA, one could wonder what fact scenario could compel such action.
- And a postscript – As noted in previous postings on this Blog, the true impact of EPA’s Environmental Justice initiatives is likely to be felt by increased EPA scrutiny of facilities (particularly new construction) in perceived over-burdened communities.[14]As a result, Port Hamilton is not going to take this victory and ride into the sunset. The Refinery will remain in EPA’s crosshairs long into the future, with scrutiny of every step or misstep. EPA, in fact, has an entire page on its website devoted solely to the Refinery air, wastewater and waste disposal obligations.So, the conclusion of the Refinery’s story is still to be written.
Footnotes
Disclaimer
While we are pleased to have you contact us by telephone, surface mail, electronic mail, or by facsimile transmission, contacting Kilpatrick Townsend & Stockton LLP or any of its attorneys does not create an attorney-client relationship. The formation of an attorney-client relationship requires consideration of multiple factors, including possible conflicts of interest. An attorney-client relationship is formed only when both you and the Firm have agreed to proceed with a defined engagement.
DO NOT CONVEY TO US ANY INFORMATION YOU REGARD AS CONFIDENTIAL UNTIL A FORMAL CLIENT-ATTORNEY RELATIONSHIP HAS BEEN ESTABLISHED.
If you do convey information, you recognize that we may review and disclose the information, and you agree that even if you regard the information as highly confidential and even if it is transmitted in a good faith effort to retain us, such a review does not preclude us from representing another client directly adverse to you, even in a matter where that information could be used against you.